SMEC PTY LTD - Water Tower Construction - Palmerston, NT

Power and Water in the Northern Territory contracted SMEC Pty Ltd to construct a 4 mega litre water tower in Palmerston, NT. The project was valued at $11.5million and took approximately 20 months to complete with the tank being 36.4 metres high and a diameter of 28.5 metres.

Ausurv Surveyors assisted SMEC with highly complex engineering set-outs and calculations along with as-constructed surveys. We also had an earthworks component which involved set out and Trimble Machine Control Support.